{"id":18548,"date":"2025-11-06T12:09:27","date_gmt":"2025-11-06T18:09:27","guid":{"rendered":"https:\/\/www.nhg.mx\/?p=18548"},"modified":"2025-12-09T12:53:15","modified_gmt":"2025-12-09T18:53:15","slug":"convocatoria-atencion-prioritaria-de-solicitudes-de-permisos-de-generacion-electrica-e-interconexion-al-sistema-electrico-nacional","status":"publish","type":"post","link":"https:\/\/www.nhg.mx\/en_gb\/convocatoria-atencion-prioritaria-de-solicitudes-de-permisos-de-generacion-electrica-e-interconexion-al-sistema-electrico-nacional\/","title":{"rendered":"Convocatoria Atenci\u00f3n Prioritaria de Solicitudes de Permisos de Generaci\u00f3n El\u00e9ctrica e Interconexi\u00f3n al Sistema El\u00e9ctrico Nacional"},"content":{"rendered":"<p><strong>Antecedentes<\/strong><\/p>\n<p><span style=\"font-weight: 400;\">El 17 de octubre de 2025, la Secretar\u00eda de Energ\u00eda (<\/span><b>\u201cSENER\u201d<\/b><span style=\"font-weight: 400;\">) public\u00f3 en el Diario Oficial de la Federaci\u00f3n la convocatoria para la atenci\u00f3n prioritaria de solicitudes de permisos de generaci\u00f3n el\u00e9ctrica e interconexi\u00f3n al Sistema El\u00e9ctrico Nacional (<\/span><b>\u201cSEN\u201d<\/b><span style=\"font-weight: 400;\">), en cumplimiento del art\u00edculo 57 del Reglamento de la Ley de Planeaci\u00f3n y Transici\u00f3n Energ\u00e9tica (<\/span><b>\u201cRLPTE\u201d<\/b><span style=\"font-weight: 400;\">) y del art\u00edculo Transitorio Vig\u00e9simo Primero del Reglamento de la Ley del Sector El\u00e9ctrico (<\/span><b>\u201cRLSE\u201d<\/b><span style=\"font-weight: 400;\">). Esta convocatoria (la \u201cConvocatoria\u201d) se emite como mecanismo extraordinario de planeaci\u00f3n vinculante hasta 2030, conforme al Plan de Desarrollo del Sector El\u00e9ctrico (<\/span><b>\u201cPLADESE\u201d<\/b><span style=\"font-weight: 400;\">).<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Conoce m\u00e1s <\/span><a href=\"https:\/\/www.nhg.mx\/wp-content\/uploads\/2025\/10\/Convocatoria_SENER_Proyectos_Generacion_Estrategicos_ESP-1.pdf\"><b>aqu\u00ed.<\/b><\/a><\/p>\n<p><span style=\"font-weight: 400;\">Si requiere informaci\u00f3n o asesor\u00eda, por favor p\u00f3ngase en contacto con cualquiera de los integrantes de nuestro equipo de Energ\u00eda.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><\/p>\n<h4><b>Call for Prioritization of Applications for Power Generation Permits and <\/b><b>Interconnection to the National Electric System<\/b><\/h4>\n<p><b>Background<\/b><\/p>\n<p><span style=\"font-weight: 400;\">On October 17, 2025, the Ministry of Energy (<\/span><b>\u201cSENER\u201d<\/b><span style=\"font-weight: 400;\">) published in the Official Gazette of the Federation the Call for Prioritization of Power Generation Permits and Interconnection to the National Electric System (<\/span><b>the \u201cCall\u201d<\/b><span style=\"font-weight: 400;\">), in compliance with Article 57 of the Regulations to the Power Sector Law (<\/span><b>\u201cRegulations to the Power Sector Law\u201d<\/b><span style=\"font-weight: 400;\">) and Transitory Article Twenty-First of the Regulations to the Planning and Energy Transition Law (<\/span><b>\u201cRegulations to the Planning and Energy Transition Law\u201d<\/b><span style=\"font-weight: 400;\">). The Call is issued as an extraordinary binding planning mechanism applicable through 2030, in alignment with the Power Sector Development Plan (the \u201c<\/span><span style=\"font-weight: 400;\">Development Plan<\/span><span style=\"font-weight: 400;\">).\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Know more <\/span><a href=\"https:\/\/www.nhg.mx\/wp-content\/uploads\/2025\/10\/Call-for-Priority-Attention-of-Electric-Generation-Permits_ENG-1.pdf\"><b>h<\/b><\/a><a href=\"https:\/\/www.nhg.mx\/wp-content\/uploads\/2025\/11\/Call-for-Priority-Attention-of-Electric-Generation-Permits_ENG_Final_Version.pdf\"><b>ere.<\/b><\/a><\/p>\n<p><span style=\"font-weight: 400;\">If you require information or assistance, please contact any member of our Energy team.<\/span><\/p>\n<div class=\"pdfprnt-buttons pdfprnt-buttons-post pdfprnt-bottom-left\"><a href=\"https:\/\/www.nhg.mx\/en_gb\/wp-json\/wp\/v2\/posts\/18548?print=pdf\" class=\"pdfprnt-button pdfprnt-button-pdf\" target=\"_blank\"><img decoding=\"async\" src=\"https:\/\/www.nhg.mx\/wp-content\/plugins\/pdf-print\/images\/pdf.png\" alt=\"image_pdf\" title=\"View PDF\" \/><\/a><a href=\"https:\/\/www.nhg.mx\/en_gb\/wp-json\/wp\/v2\/posts\/18548?print=print\" class=\"pdfprnt-button pdfprnt-button-print\" target=\"_blank\"><img decoding=\"async\" src=\"https:\/\/www.nhg.mx\/wp-content\/plugins\/pdf-print\/images\/print.png\" alt=\"image_print\" title=\"Print Content\" \/><\/a><\/div>","protected":false},"excerpt":{"rendered":"<p>Antecedentes El 17 de octubre de 2025, la Secretar\u00eda de Energ\u00eda (\u201cSENER\u201d) public\u00f3 en el Diario Oficial de la Federaci\u00f3n la convocatoria para la atenci\u00f3n prioritaria de solicitudes de permisos de generaci\u00f3n el\u00e9ctrica e interconexi\u00f3n al Sistema El\u00e9ctrico Nacional (\u201cSEN\u201d), en cumplimiento del art\u00edculo 57 del Reglamento de la Ley de Planeaci\u00f3n y Transici\u00f3n Energ\u00e9tica&#8230;<\/p>\n<div class=\" [&hellip;]\"><a href=\"https:\/\/www.nhg.mx\/en_gb\/convocatoria-atencion-prioritaria-de-solicitudes-de-permisos-de-generacion-electrica-e-interconexion-al-sistema-electrico-nacional\/\">Read More<\/a><\/div>\n","protected":false},"author":9,"featured_media":18632,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[386],"tags":[],"class_list":["post-18548","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-legal-alerts"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.nhg.mx\/en_gb\/wp-json\/wp\/v2\/posts\/18548","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nhg.mx\/en_gb\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nhg.mx\/en_gb\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nhg.mx\/en_gb\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nhg.mx\/en_gb\/wp-json\/wp\/v2\/comments?post=18548"}],"version-history":[{"count":1,"href":"https:\/\/www.nhg.mx\/en_gb\/wp-json\/wp\/v2\/posts\/18548\/revisions"}],"predecessor-version":[{"id":18549,"href":"https:\/\/www.nhg.mx\/en_gb\/wp-json\/wp\/v2\/posts\/18548\/revisions\/18549"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nhg.mx\/en_gb\/wp-json\/wp\/v2\/media\/18632"}],"wp:attachment":[{"href":"https:\/\/www.nhg.mx\/en_gb\/wp-json\/wp\/v2\/media?parent=18548"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nhg.mx\/en_gb\/wp-json\/wp\/v2\/categories?post=18548"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nhg.mx\/en_gb\/wp-json\/wp\/v2\/tags?post=18548"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}