{"id":18550,"date":"2025-11-06T12:14:20","date_gmt":"2025-11-06T18:14:20","guid":{"rendered":"https:\/\/www.nhg.mx\/?p=18550"},"modified":"2025-12-09T12:54:01","modified_gmt":"2025-12-09T18:54:01","slug":"disposiciones-administrativas-de-caracter-general-para-la-planeacion-vinculante-en-la-actividad-de-generacion-de-energia-electrica","status":"publish","type":"post","link":"https:\/\/www.nhg.mx\/es\/disposiciones-administrativas-de-caracter-general-para-la-planeacion-vinculante-en-la-actividad-de-generacion-de-energia-electrica\/","title":{"rendered":"Disposiciones Administrativas de Car\u00e1cter General para la Planeaci\u00f3n Vinculante en la Actividad de Generaci\u00f3n de Energ\u00eda El\u00e9ctrica"},"content":{"rendered":"<p><strong>Antecedentes<\/strong><\/p>\n<p><span style=\"font-weight: 400;\">El 17 de octubre de 2025 la Secretar\u00eda de Energ\u00eda (\u201c<\/span><span style=\"font-weight: 400;\">SENER<\/span><span style=\"font-weight: 400;\">\u201d) public\u00f3 en el Diario Oficial de la Federaci\u00f3n las Disposiciones Administrativas de Car\u00e1cter General para la Planeaci\u00f3n Vinculante en la Actividad de Generaci\u00f3n de Energ\u00eda El\u00e9ctrica (las \u201c<\/span><span style=\"font-weight: 400;\">Disposiciones<\/span><span style=\"font-weight: 400;\">\u201d), con entrada en vigor el mismo d\u00eda de su publicaci\u00f3n.<\/span><\/p>\n<p><strong><i>Objeto y Alcance<\/i><\/strong><\/p>\n<p><span style=\"font-weight: 400;\">Las Disposiciones establecen criterios obligatorios que la Comisi\u00f3n Nacional de Energ\u00eda (\u201c<\/span><span style=\"font-weight: 400;\">CNE<\/span><span style=\"font-weight: 400;\">\u201d) debe considerar para evaluar que los proyectos de generaci\u00f3n cumplen con la planeaci\u00f3n vinculante previo al otorgamiento de permisos.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Aplica a proyectos para el Mercado El\u00e9ctrico Mayorista (\u201c<\/span><span style=\"font-weight: 400;\">MEM<\/span><span style=\"font-weight: 400;\">\u201d) (p\u00fablicos y privados). No aplica a proyectos de generaci\u00f3n para autoconsumo y cogeneraci\u00f3n.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Conoce m\u00e1s <\/span><a href=\"https:\/\/www.nhg.mx\/wp-content\/uploads\/2025\/10\/Memorandum_DACGs_Planeacion_Vinculante_ESP-1.pdf\"><span style=\"font-weight: 400;\">aqu\u00ed.<\/span><\/a><\/p>\n<p><span style=\"font-weight: 400;\">Si requiere informaci\u00f3n o asesor\u00eda, por favor p\u00f3ngase en contacto con cualquiera de los integrantes de nuestro equipo de Energ\u00eda.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"mailto:EnergyandInfrastructure@nhg.com.mx\"><span style=\"font-weight: 400;\">EnergyandInfrastructure@nhg.com.mx<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><\/a><\/p>\n<h4><b>General Administrative Provisions for <\/b><b>Binding Planning in Power Generation Activities<\/b><\/h4>\n<p><strong>Antecedentes<\/strong><\/p>\n<p><span style=\"font-weight: 400;\">On October 17, 2025, the Ministry of Energy (\u201c<\/span><span style=\"font-weight: 400;\">SENER<\/span><span style=\"font-weight: 400;\">\u201d) published in the Official Gazette of the Federation the General Administrative Provisions for Binding Planning in Power Generation Activities (the \u201c<\/span><span style=\"font-weight: 400;\">Provisions<\/span><span style=\"font-weight: 400;\">\u201d), which entered into force on the same date of their publication.<\/span><\/p>\n<p><strong><i>Purpose and Scope<\/i><\/strong><\/p>\n<p><span style=\"font-weight: 400;\">The Provisions establish mandatory criteria that the National Energy Commission (\u201c<\/span><span style=\"font-weight: 400;\">CNE<\/span><span style=\"font-weight: 400;\">\u201d) must consider when evaluating whether generation projects comply with binding planning before granting the relevant generation permits.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">They apply to projects intended for participation in the Wholesale Electricity Market (\u201c<\/span><span style=\"font-weight: 400;\">MEM<\/span><span style=\"font-weight: 400;\">\u201d), (public and private). Does not apply to self- supply or cogeneration projects.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Know more <\/span><a href=\"https:\/\/www.nhg.mx\/wp-content\/uploads\/2025\/11\/General_Administrative_Provisions_for_Binding_ENG_Final_Version.pdf\"><span style=\"font-weight: 400;\">here.<\/span><\/a><\/p>\n<p><span style=\"font-weight: 400;\">If you require information or assistance, please contact any member of our Energy team.<\/span><\/p>\n<p><a href=\"mailto:EnergyandInfrastructure@nhg.com.mx\"><span style=\"font-weight: 400;\">EnergyandInfrastructure@nhg.com.mx<\/span><\/a><\/p>\n<div class=\"pdfprnt-buttons pdfprnt-buttons-post pdfprnt-bottom-left\"><a href=\"https:\/\/www.nhg.mx\/es\/wp-json\/wp\/v2\/posts\/18550?print=pdf\" class=\"pdfprnt-button pdfprnt-button-pdf\" target=\"_blank\"><img decoding=\"async\" src=\"https:\/\/www.nhg.mx\/wp-content\/plugins\/pdf-print\/images\/pdf.png\" alt=\"image_pdf\" title=\"View PDF\" \/><\/a><a href=\"https:\/\/www.nhg.mx\/es\/wp-json\/wp\/v2\/posts\/18550?print=print\" class=\"pdfprnt-button pdfprnt-button-print\" target=\"_blank\"><img decoding=\"async\" src=\"https:\/\/www.nhg.mx\/wp-content\/plugins\/pdf-print\/images\/print.png\" alt=\"image_print\" title=\"Print Content\" \/><\/a><\/div>","protected":false},"excerpt":{"rendered":"<p>Antecedentes El 17 de octubre de 2025 la Secretar\u00eda de Energ\u00eda (\u201cSENER\u201d) public\u00f3 en el Diario Oficial de la Federaci\u00f3n las Disposiciones Administrativas de Car\u00e1cter General para la Planeaci\u00f3n Vinculante en la Actividad de Generaci\u00f3n de Energ\u00eda El\u00e9ctrica (las \u201cDisposiciones\u201d), con entrada en vigor el mismo d\u00eda de su publicaci\u00f3n. Objeto y Alcance Las Disposiciones&#8230;<\/p>\n<div class=\" [&hellip;]\"><a href=\"https:\/\/www.nhg.mx\/es\/disposiciones-administrativas-de-caracter-general-para-la-planeacion-vinculante-en-la-actividad-de-generacion-de-energia-electrica\/\">Read More<\/a><\/div>\n","protected":false},"author":9,"featured_media":18631,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[386],"tags":[],"class_list":["post-18550","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-legal-alerts"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.nhg.mx\/es\/wp-json\/wp\/v2\/posts\/18550","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nhg.mx\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nhg.mx\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nhg.mx\/es\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nhg.mx\/es\/wp-json\/wp\/v2\/comments?post=18550"}],"version-history":[{"count":1,"href":"https:\/\/www.nhg.mx\/es\/wp-json\/wp\/v2\/posts\/18550\/revisions"}],"predecessor-version":[{"id":18551,"href":"https:\/\/www.nhg.mx\/es\/wp-json\/wp\/v2\/posts\/18550\/revisions\/18551"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nhg.mx\/es\/wp-json\/wp\/v2\/media\/18631"}],"wp:attachment":[{"href":"https:\/\/www.nhg.mx\/es\/wp-json\/wp\/v2\/media?parent=18550"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nhg.mx\/es\/wp-json\/wp\/v2\/categories?post=18550"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nhg.mx\/es\/wp-json\/wp\/v2\/tags?post=18550"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}